Concrete Volume

Estimate concrete volume for a rectangular slab, footing, or similar form.

Enter your values in the calculator fields to get an instant result.

Calculator guide

Estimate concrete volume for a rectangular slab, footing, or similar form.

Formula or method

Volume = length × width × depth. Convert cubic feet to cubic yards by dividing by 27; add a practical waste allowance separately.

How to use this calculator

  1. Enter length and width in a consistent unit.
  2. Enter the average depth.
  3. Review cubic feet and yards, then discuss ordering and waste with the supplier.

Worked example

A 20 ft × 10 ft slab at 4 in (1/3 ft) needs 66.67 ft³, or 66.67/27≈2.47 yd³; 10% allowance makes about 2.72 yd³.

Understanding the result

Order quantities are normally rounded up and depend on site shape, grade, and supplier minimums.

Limitations and assumptions

  • Assumes a rectangular uniform depth and does not model thickened edges or irregular ground.
  • Waste allowance is a planning choice, not a guarantee.

Frequently asked questions

Why use average depth?

A sloped or uneven base needs several sections or a site measurement.

Should I add waste?

Many projects allow roughly 5–10%, but ask the ready-mix supplier.

Does this include reinforcement?

No; rebar, forms, pumping, and finishing are separate.

Sources

Educational information only; verify important decisions with a qualified professional.